Specifications
Confirm model, interface type, rate, power, airflow and software version before ordering.
MFS1S00-H020V is the 20 m QSFP56 AOC described for 200Gb/s InfiniBand HDR and 200GbE. At this length, a deployable design needs an end-to-end pathway survey, endpoint and FEC confirmation, power and thermal review, installation protection and an acceptance record. A nominal 20 m length does not mean every route between two 200G ports is valid.
| Area | Retained record | Deployment evidence needed |
|---|---|---|
| Ordering code | MFS1S00-H020V, 20 m | OPN matches quote, received item and cable label |
| Protocol and rate | 200Gb/s InfiniBand HDR and 200GbE | Endpoint mode, firmware, FEC and lane settings are recorded |
| Connector | SFF-8665 QSFP56 is stated | Both device ports explicitly support the complete cable OPN |
| Signaling | Four 50Gb/s PAM4 channels and optional retiming are described | Current data sheet and endpoint diagnostics are checked |
| Power reference | 5.0 W typical per end with retiming | Rack power, airflow and operating conditions are reviewed |
The protocol and high-level electrical references are shared with the 15 m H015V record. The 20 m H020V design places more weight on route accuracy, tray fill, pulling method, labeling and replacement access. Do not select the longer OPN automatically: excess fixed cable also requires controlled storage and bend management.
No. Choose from the measured path and controlled service slack; unmanaged excess can complicate bend, airflow and replacement.
No. The link still drops, and the operational effect depends on topology, redundancy, routing and application behavior.
No. Connector, protocol, speed, FEC, firmware and complete cable support must all be verified.
Evidence boundary: The 20 m OPN and listed series attributes come from the retained record. This page does not promise price, stock, delivery, authorization, certification, warranty, lifecycle, universal compatibility or measured improvement.
Compare other HDR and 200GbE cable lengths, review a 200G network deployment, and use the interconnect acceptance workflow.
Confirm model, interface type, rate, power, airflow and software version before ordering.
Check the host server, switch fabric, firmware, slot, optics or cable and supported operating mode before ordering.
Share quantity, topology, deployment window, delivery region and replacement requirements for a practical recommendation.
Validate the representative host, peer device, driver, firmware and link media before a wider rollout.