Specifications
Confirm model, interface type, rate, power, airflow and software version before ordering.
The H3C S5120V2-28P-HPWR-LI may be considered for managed Gigabit campus access, but the source retained for this record confirms only the S5120V2-LI family position. It does not contain a model-level port or power table. The HPWR suffix must therefore be verified against the complete ordering code before PoE capability, power configuration or uplink layout is accepted.
| Decision area | Required model-level evidence |
|---|---|
| Access ports | Quantity, media, speeds and combinations that can operate together |
| PoE | Supported standard, per-port boundary, total budget and budget after a power fault |
| Uplinks | Port type, speed, supported optics or cables and peer compatibility |
| Power and cooling | Power modules, redundancy behavior, airflow, consumption and site constraints |
| Software | Comware release, required Layer 2 functions, management and license boundaries |
Do not treat 28P-HPWR-LI, 28P-PWR-LI and 28P-LI as identical configurations. Compare the complete ordering codes, powered-port capability, total PoE budget, power modules, uplinks, dimensions, acoustics, software and support period. A suffix difference can change the bill of materials.
No. A suffix is not sufficient contractual evidence. Confirm the exact power and PoE configuration in the model document and accepted bill of materials.
No. A quotation should identify the complete ordering code, quantity, included modules, software and support scope.
Evidence boundary: This page does not confirm price, stock, lead time, authorization, warranty or current lifecycle. Use dated project documents for those claims.
Browse the H3C switch catalog and use the campus-switch buyer guide to prepare the PoE and uplink checks.
Confirm model, interface type, rate, power, airflow and software version before ordering.
Check the host server, switch fabric, firmware, slot, optics or cable and supported operating mode before ordering.
Share quantity, topology, deployment window, delivery region and replacement requirements for a practical recommendation.
Validate the representative host, peer device, driver, firmware and link media before a wider rollout.
Start with the required speed, interface, host platform and deployment role before comparing nearby models.
Confirm firmware, drivers, optics or cables, peer-device interoperability and the workload that matters to the project.
Provide the model, quantity, topology, target equipment, delivery region and required date so the next step is clear.
H3C S5120V2-28P-HPWR-LI: PoE and Uplink Verification can be evaluated for H3C Switches projects, capacity expansion and replacement planning.
Confirm the host or switch model, slot, port mode, speed, firmware, operating system and the required cable or optic.
Use the intended peer device and workload to check link negotiation, driver or firmware behavior, throughput and stability.
Match the model to the required interface, rate, topology, software boundary, lifecycle and delivery schedule.
Compare the server or switch, port mode, speed, media, firmware and deployment environment; use a PoC when any boundary is uncertain.
Send the target model, quantity, existing equipment, link speed, distance, delivery date and replacement tolerance.
Previous:S1850-28P Ethernet Switches